NEW QUESTION 37
You want to perform capacity availability checks on your production orders. What must be set for this to occur? Note: There are 2 correct answers to this question.
- A. Checking rule and group must be assigned.
- B. PRT Availability check must be set.
- C. Indicator Relevant for finite scheduling must be set.
- D. Checking control must have an overall profile assigned in customizing.
Answer: C,D
NEW QUESTION 38
What are some of the SAP Fiori user types?
There are 3 correct answers to this question.
Response:
- A. Developer
- B. Business partner
- C. Employee
- D. Occasional
- E. Expert
Answer: A,D,E
NEW QUESTION 39
How can SAP S/4HANA support a GMP compliant production process? Note: There are 3 correct answers to this question.
- A. Predefined GMP compliant process order types to meet audit requirements
- B. Documentation of quality data with Quality Management
- C. Recipe approval (with Engineering Change Management)
- D. Use of the GMP compliant flag in relevant master data applications
- E. Use of the digital signature function to check and run business processes
Answer: B,C,E
NEW QUESTION 40
The procurement type of your material is set to "E" for In-house production. Which of the following is valid to determine a source of supply in SAP S/4HANA?
Please choose the correct answer.
Response:
- A. Production Version
- B. Purchasing Info Record
- C. Selection Method
- D. Contract
Answer: A
NEW QUESTION 41
You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling in the past. How can you achieve this?
- A. Specify a negative planning horizon in the strategy profile.
- B. Specify a positive planning horizon in the strategy profile.
- C. Specify a positive offset time in the strategy profile.
- D. Specify a negative offset time in the strategy profile.
Answer: D
NEW QUESTION 42
How does the new Inventory Management Data model contribute to the reduction of the data footprint?
There are 3 correct answers to this question.
Response:
- A. By eliminating inventory history tables
- B. By eliminating fields for different stock types
- C. By eliminating material master tables
- D. By eliminating inventory tables
- E. By eliminating hybrid tables
Answer: A,B,D
NEW QUESTION 43
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.
- A. Reduce the planning window.
- B. Form optimum sequences to reduce setup times.
- C. Select an alternative mode on a resource.
- D. Execute a new production planning run.
- E. Adjust the available capacity.
Answer: B,C,E
NEW QUESTION 44
You are using heuristic SAP_ERP_001. Which of the following criteria are included in the automatic source determination logic when a planned order is created?
Please choose the correct answer.
Response:
- A. Delivery date
- B. Costs
- C. Quota arrangement
- D. Component availability
- E. Vendor rating
Answer: C
NEW QUESTION 45
Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question.
- A. Creation of dependent requirements
- B. Change of the storage bin
- C. Creation of a sales order
- D. Change of the material's procurement type
- E. Creation of a purchasing contract
Answer: A,C,D
NEW QUESTION 46
Before a user can add multiple production versions in a material master, what information should be collected?
There are 3 correct answers to this question.
Response:
- A. Validity dates
- B. Task list group number
- C. BOM status
- D. Lot sizes
- E. Work center hierarchy
Answer: A,C,D
NEW QUESTION 47
Which advanced functionality has been embedded in SAP S/4HANA?
There are 3 correct answers to this question.
Response:
- A. Backorder processing
- B. Supply Network Planning
- C. Capacity planning
- D. Demand planning
- E. Available-to-promise
Answer: A,C,E
NEW QUESTION 48
In your project, you have several materials that are planned by different people. How can you assign the planning responsibility?
- A. MRP controller
- B. MRP planning file
- C. MRP type
- D. MRP group
Answer: A
NEW QUESTION 49
What do you use to schedule operations from planned orders so that the production plan can be fulfilled?
- A. Demand Planning (DP)
- B. Supply Network Planning (SNP)
- C. Capacity Requirements Planning (CRP)
- D. Material Requirements Planning (MRP)
Answer: D
NEW QUESTION 50
What are main innovations in manufacturing in SAP S/4HANA?
There are 3 correct answers to this question.
Response:
- A. Monitor Production Orders Fiori app
- B. Material Coverage Fiori app
- C. Flow manufacturing
- D. Lock-free inventory movements
- E. Rough-cut capacity planning
Answer: A,B,D
NEW QUESTION 51
How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. By plant
- B. By material type
- C. By industry
- D. By period
Answer: A,D
NEW QUESTION 52
Which functional capabilities does the Detailed Scheduling Board have?
There are 2 correct answers to this question.
Response:
- A. Change sales order quantities
- B. Undo for drag & Drop planning activities
- C. Enter time-ticket confirmation for production orders
- D. Change planned order quantities
Answer: B,D
NEW QUESTION 53
......
C_TS422_1909 Dumps for Pass Guaranteed - Pass C_TS422_1909 Exam: https://pass4sure.trainingquiz.com/C_TS422_1909-training-materials.html