Microsoft MB-335 certification exam is designed for professionals who specialize in supply chain management and are looking to enhance their skills and knowledge in the field. MB-335 exam is part of the Microsoft Dynamics 365 certification program and is specifically tailored for functional consultants with expertise in supply chain management. Passing MB-335 exam validates the skills and knowledge required to perform the job of a functional consultant expert in supply chain management.

 

NEW QUESTION # 16
A company uses the production control module in Dynamics 365 Supply Chain Management.
Production workers require precise instructions to know which tools and parts to use and how to use them when the workers put things together during the assembly process.
You need to configure the system to initiate mixed reality Dynamics 365 Guides for production workers.
Which four actions should you recommend be performed in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation:


NEW QUESTION # 17
A company uses Dynamics 365 Supply Cham Management.
Several production orders are in the started status.
An issue with equipment causes a rollback in the production status tor some of the orders.
Some orders must be reset once the equipment is repaired, based on which products were being manufactured.
You need to reset the production orders based on the requirements
Which status should you use for each requirement? To answer, drag the appropriate statuses to the correct requirements. Each status may be used once, more than once, or not at all.
You may need to drag the split bar between panes or scroll to view content.

Answer:

Explanation:


NEW QUESTION # 18
You are developing a new car audio system kit. The kit configuration has restrictions based on car model, speaker size, and other expression constraints.
You need to set up a new item for the car audio system.
How should you create the new product? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation:
Product Master
Configuration
Constraint-based configuration
The Constraint-based configuration configuration technology can only be defined if the configuration dimension is the only active dimension on the product dimension group.
https://docs.microsoft.com/en-us/dynamics365/supply-chain/pim/set-up-maintain-product-configuration-model


NEW QUESTION # 19
A bicycle manufacturing company is implementing Dynamics 365 Supply Chain Management.
The warehouse must pick and stage parts other than paint for bicycle assembly. Paint is at the production station.
You need to configure the reservations for production.
What should you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation:
To configure the reservations for production, you should do the following:
* Define configuration for paint reservation: You should configure the Item model group for paint. The Item model group determines the inventory policies for an item, such as reservation, tracking, and costing1. You can set the reservation policy for paint to FIFO date-controlled, which means that the inventory reservation is controlled by a sorting date according to the FIFO principle2. You can also set the Backward from ship date option, which means that the inventory reservation is controlled by the last update physical date according to the FIFO rule2.
* Define the reservation principle for paint: You should set the reservation principle to Start. This means that inventory is reserved when production starts3. This way, you can ensure that paint is available at the production station when needed


NEW QUESTION # 20
A company produces custom-made bicycles that offer many different configurations.
Your standard bicycle, B-0001, is made with many common components such as a frame and wheels. Customers can choose between two frames: F-0001 or F-0009. Wheel W-0001 is only compatible with frame F-0001.
You create the following configuration groups: Frames, Wheels
You need to ensure that users can only select valid combinations of frames and wheels.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

1 - Assign the Frames and Wheels configuration..
2 - Create a new Bill of materials version..
3 - Add the Frames and Wheels configuration groups to the configuration route
4 - Configure the two bicycle configurations
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/pim/dimension-based-product-configuration


NEW QUESTION # 21
A manufacturing company uses time and attendance in Dynamics 365 Supply Chain Management.
Break times are paid. The cost of a break time must be charged at the pay rate of the job in progress when the break starts.
You need to configure the break times to charge against the job in progress.
Which two actions should you perform? Each answer presents a partial solution.
NOTE; Each correct selection is worth one point.

  • A. Set Direct Payroll Cost Standard Time to Yes.
  • B. Set Production Order Cost Category to No.
  • C. Set Direct Payroll Cost Standard Time to No.
  • D. Set Production Order Cost Category to Yes.
  • E. Set Direct Payroll Cost Standard Time to Allocate.

Answer: A,D


NEW QUESTION # 22
You need to set up the state control for sales of motorcycles.
Which two actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. Create an exclusive restricted product list for Missouri and add the motorcycle part to the list.
  • B. Create an exclusive restricted product list for California and add the motorcycle part to the list.
  • C. Create an inclusive restricted product list for United States and add the motorcycle part to the list.
  • D. Create an inclusive restricted product list for United States. Do not add the motorcycle part to the list.

Answer: B,C

Explanation:
Reference:
https://stoneridgesoftware.com/working-with-restricted-products-in-dynamics-365-operations/


NEW QUESTION # 23
A company has manufacturing sites that process different types of production orders using highly specialized equipment.
Released production orders have been processing for an excessive amount of time while the system tries to find a viable route that conforms to the constraints specified in the system.
The system must automatically time out if a viable solution is not found after 120 seconds.
You need to configure the automatic timeout.
Which form should you use for each configuration? To answer, drag the appropriate forms to the correct configurations. Each form may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation:
A screenshot of a computer AI-generated content may be incorrect.


NEW QUESTION # 24
You need to set up the configuration model to price the motorcycles correctly. What should you do?

  • A. Set Order type in price model to Sales Order and Pricing method in Version to Cost based.
  • B. Set Order type in price model to Sales Quotation and Pricing method in Version to Attribute based.
  • C. Set Order type in price model to Sales Quotation and Pricing method in Version to Cost based
  • D. Set Order type in price model to Sales Order and Pricing method in Version to Attribute based

Answer: D


NEW QUESTION # 25
You need to resolve the production manager issue.
How should you configure manufacturing execution? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation:

Reference:
https://docs.microsoft.com/en-us/dynamicsax-2012/appuser-itpro/about-production-parameters-in- manufacturing-execution
Topic 3, Case Study 3 Adventure Works
This is a case study. Case studies are not timed separately. You can use as much exam time as you would like to complete each case. However, there may be additional case studies and sections on this exam. You must manage your time to ensure that you are able to complete all questions included on this exam in the time provided.
To answer the questions included in a case study, you will need to reference information that is provided in the case study. Case studies might contain exhibits and other resources that provide more information about the scenario that is described in the case study. Each question is independent of the other question on this case study.
At the end of this case study, a review screen will appear. This screen allows you to review your answers and to make changes before you move to the next section of the exam. After you begin a new section, you cannot return to this section.
To start the case study
To display the first question on this case study, click the Next button. Use the buttons in the left pane to explore the content of the case study before you answer the questions. Clicking these buttons displays information such as business requirements, existing environment, and problem statements. If the case study has an All Information tab, note that the information displayed is identical to the information displayed on the subsequent tabs. When you are ready to answer a question, click the Question button to return to the question.
Background
Adventure Works Cycles is a high-end bicycle manufacturer in North America. Their standard model bicycles are available year-round. Limited-edition bicycle models are released several times a year to boutique retailers domestically.
Adventure Works has had the most success with their limited-edition bicycles. These bicycles have high margins, are in high demand, and have a strong following with the younger generation biking community.
Current environment
General
Adventure Works expects to triple their manufacturing capabilities in the next few years due to increasing demand. The company plans to invest in Dynamics 365 Finance, Dynamics 365 Supply Chain Management, and the Power Platform products to migrate from a custom-built enterprise resource planning (ERP) solution and Microsoft Excel worksheets.
Adventure Works sells only to the United States and Canada. Despite their limited market, they cannot keep up with current demand. Over time, they want to expand their market to remain profitable.
Adventure Works has no capabilities or budget to undertake any development beyond Excel formula-level tasks.
Bicycle manufacturing
* Bicycle models are measured and reported against how well a single model performs as a sum of all the variations of that model. For example, the Street Kid YOLO model sold 25,000 units in 2019 across all variations of the product, but the Purple Female frame made up 30 percent of that model's sales.
* The Street Kid YOLO models sell in different volumes depending on the market.
* The creation of production orders for bicycles occurs monthly and is based on historical sales.
* Each part of a bicycle's assembly occurs at a different station in the Adventure Works production facility.
* A piece of paper that has eight sections accompanies a bicycle throughout the manufacturing process.
As each step is completed, the respective section is completed and signed off by a production worker.
* The completed paper is used in the put-away process by the warehouse workers.
Financials
* The standard model and limited-edition bicycle teams are separate operating units within the manufacturing division. Financials are tracked and reported separately even though they are produced and sold in the same sales channels.
* Updates to the standard model bicycle models are created when a part for a bicycle becomes unavailable. This can change the cost of the product.
* An updated model of a bicycle with new parts will be maintained as a new item and have a new price.
However, it will look like the exact same product to retailers and distributors.
Manufacturing process
The bicycle manufacturing process is shown in the following graphic:

Limited-edition bicycle process
The limited-edition bicycles are made up of an Adventure Works custom frame with all other parts created by local artists and manufacturers.
* Each bicycle has a unique set of new items that make up the bill of materials (BOM) because all parts are created to specification.
* A single pilot limited-edition bicycle is created as a proof of concept.
* Adventure Works occasionally reuses components from existing bicycles, but most limited-edition bicycles are made of handcrafted components designed to specifications.
* Each limited-edition bicycle is built, and hand signed by a single Adventure Works artisan.
* Sales price must be auto calculated after the cost price is derived.
* Before creating the proof of concept limited-edition bicycle, the approximate sales price needs to be determined through a cost-plus 20 percent calculation.
* All items except for the frame in the prototype process are considered finished items and can be sold individually.
* The frame items require modifications in accordance with the manufacturing process as well as painting.
* Each Adventure Works limited-edition bicycle artisan is scheduled to create a specific number of bicycles in a production run that must be completed by a certain date.
* Limited-edition bicycle artisans work exclusively on a given run of limited-edition bicycles and are not able to work on other tasks.
Limited-edition bicycle BOM assembly process
The prototype process for the limited-edition bicycles is shown in the following graphic:

Requirements
General
* Adventure Works will consist of three legal entities: the primary legal entity of the United States (AWUS), sales in Canada (AWCA), and an international expansion (AWIN).
* AWIN must be able to sell only standard model bicycles.
* AWUS and AWCA must be able to sell both standard model and limited-edition bicycles.
* Warehouse workers must use the Warehouse Management mobile application to manage all inventory inbound and outbound from the warehouse.
Bicycle manufacturing
* The handlebars, back wheels, and front wheels must not change for any of the bicycle model configurations.
* Standard model bicycle production scheduling must be configured to start as soon as possible.
* Bicycle components must be automatically reserved when the item is released to the production floor.
* Standard model bicycle production must be automatically created on a predefined schedule.
* As soon as bicycles are completed, they must be available to fulfill the backlog of orders.
* Limited-edition bicycle production must be configured to meet the end date for when the bicycles must be completed.
* Production orders need to track financials by standard model or limited-edition bicycle manufacturing teams.
* The system must log the immediate consumption of BOMs for traceability.
* All inventory is warehouse enabled.
* Finished goods are reported as finished by the warehouse worker who picks up the finished product from the packaging area.
* Finished products must automatically have put-away work completed for them.
New limited-edition bicycle process
Adventure Works is creating a new, limited-edition bicycle to commemorate the company's tenth anniversary. The limited-edition bicycle will be designed for charity events and be produced for the summer season.
* The bicycle must be available in men's, women's, and unisex frame styles. It will be painted in one of
50 hand-painted designs representing the charity of the customer's choosing.
* A limited run of 100 bicycles must be created.
* The limited-edition bicycles must use the same production process as the standard model bicycles.
* The limited-edition bicycles must use the same parts used for previous limited-edition bicycles, except for the unique paint colors.
* Frames must be painted in-house.
* Five painting options are available only in the unisex frame style.
New limited-edition bicycle orders
* Customers must be able to place sales orders for the item in the chosen frame configuration, including style and color.
* When an order for the new limited-edition bicycle is created, payment must be provided.
* An approval for an order must exist for the order to be processed.
* Upon approval of an order, production must start immediately and not require re-entry of data.


NEW QUESTION # 26
A manufacturing company uses Dynamics 365 Supply Cham Management The company operates three eight-hour shifts per day. Monday through Friday.
The company purchased equipment for a new process that cannot be performed with easting equipment. This specialized equipment performs only this unique task. The machinery must always be monitored and controlled by a worker.
The machine must be added to the existing production line and be ready as soon as possible. Future planned production orders must not overload the running maximums of the new machine.
You need to configure the system.
Which four actions must you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation:


NEW QUESTION # 27
A bicycle manufacturer uses Dynamics 365 Supply Chain Management.
The manufacturer experiences a supply chain issue with a metal used to fabricate the wheel. Due to the issue, the manufacturer must change the bicycle wheel assembly temporarily. Production workers require an interactive visual guide to complete production.
You need to configure the features.
Which features should you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation:


NEW QUESTION # 28
A company uses Dynamics 365 Supply Chain Management for its rebate management processes.
The company must be able to selectively process certain transactions created from the rebate management process during a specific month. The unprocessed transactions will be recreated during the following month by using the Process function.
You need to enable the feature that meets the requirement.
Which feature should you enable?

  • A. Use claim process
  • B. Include order type journal
  • C. Default status
  • D. Rebates at invoicing
  • E. Process by dimensions

Answer: A


NEW QUESTION # 29
A company implements Dynamics 365 for Finance and Operations. You must use functionality in the system for group production runs to prevent downtime and excessive cleaning of the machines on the production line.
You need to set up the system.
Which behaviors should you expect? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:


NEW QUESTION # 30
A customer produces light projection toys for holiday decorations throughout the year. Because holidays vary by region and time of year, the company wants to implement Lean manufacturing.
The production process creates the toys at the following work cells: stands, main assembly, electric, visuals, and packaging. You need to implement the production process.
Which configuration options should you use? To answer, select the appropriate configuration options in the answer area. NOTE Each correct selection is worth one point.

Answer:

Explanation:

Explanation:


NEW QUESTION # 31
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A manufacturing plant uses Lean processes. You plan to outsource a painting operation to a subcontracting vendor. You create a service item named SP-01 to represent the painting service.
You need to create a subcontracting activity for the painting service.
Solution:
* Create a purchase agreement for the subcontracting vendor that contains the pricing information for SP-01.
* Create a vendor resource and a work cell for outsourced painting, then add the resource to the work cell.
* Create a production flow process activity using the painting work cell and the service item as the picking activity.
* Create a service term on the activity to tie the purchase agreement to the activity.
Does the solution meet the goal?

  • A. Yes
  • B. No

Answer: A

Explanation:
The solution meets the goal. Here is the explanation:
To create a subcontracting activity for the painting service, you should use the following steps1:
Create a purchase agreement for the subcontracting vendor that contains the pricing information for SP-01. This step is correct, because you need to create a purchase agreement that defines the terms and conditions for purchasing the subcontracting service from the vendor1. You also need to add a purchase agreement line for SP-01 and specify the quantity and price of the service.
Create a vendor resource and a work cell for outsourced painting, then add the resource to the work cell. This step is correct, because you need to create a resource that is assigned to the vendor account and add it to a resource group that represents the subcontracting work cell1. This way, you can assign the subcontracting activity to the vendor resource.
Create a production flow process activity using the painting work cell and the service item as the picking activity. This step is correct, because you need to create a process activity that represents the subcontracting service in the production flow1. You also need to specify the painting work cell as the resource group and SP-01 as the product of the process activity. You also need to select the Generate license plate option on the mobile device menu item that is used for reporting as finished1.
Create a service term on the activity to tie the purchase agreement to the activity. This step is correct, because you need to create a service term that links the purchase agreement line to the production flow process activity1. A service term defines how a service item is consumed in production and how it is invoiced by the vendor.
1: Activity-based subcontracting


NEW QUESTION # 32
You need to configure lot number control for inventory. Which option should you use?

  • A. Blank receipt allowed
  • B. Blank issue allowed
  • C. Physical inventory
  • D. Primary socking

Answer: C


NEW QUESTION # 33
A company produces pipe at certain fixed lengths.
The company must be able to schedule cutting machines. You set up the cutting machines as resources. AH cutting resources can produce many of the products. There are some products that require cutting machines that can produce longer lengths of product. Only some of the machines can do this.
You need to configure the resources to account for these different products.
What should you do?

  • A. Build capability related to length and assign to the appropriate resources.
  • B. Create a resource for each length.
  • C. Create a resource group for each length.
  • D. Configure the Data/Hour option on the Capacity unit field on the resource.

Answer: A


NEW QUESTION # 34
A company uses Discrete manufacturing concepts to produce cables. The company's production scheduler uses internal documents to track issues on in-process production orders.
The production scheduler must group all in-process production orders according to issues. The scheduler must be able to easily determine issues with production orders.
You need to implement a method to easily identify production orders with issues.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation:


NEW QUESTION # 35
A company implements Dynamics 365 Supply Cham Management.
You need to ensure that cost roll-ups and sales price calculations are configured for the scenario. Which options should you use? To answer select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation:


NEW QUESTION # 36
You need to set up the system to calculate the overhead rates automatically for production.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

1 - Create cost groups.
2 - Associate cost groups to itmes and resources.
3 - Create overhead calculation node for materials...
4 - Define the basis for calculationg costs as absorption.


NEW QUESTION # 37
......


Microsoft MB-335 Exam consists of multiple-choice questions designed to assess your knowledge across five content categories. The categories include Implementation Planning, Solution Configuration, Data Management and Migration, Testing, and Support and Maintenance. The test is run and administered by Pearson Vue and can be taken at Pearson Vue centers or online testing centers.


Microsoft MB-335 exam is an essential certification for individuals who want to demonstrate their expertise in Dynamics 365 Supply Chain Management. Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert certification demonstrates that the candidate has the knowledge and skills to implement and configure the application to meet the needs of an organization, and it is recognized by employers worldwide. By passing the exam, candidates can increase their job prospects, advance their careers, and contribute to the success of their organizations.

 

MB-335 Questions PDF [2026] Use Valid New dump to Clear Exam: https://pass4sure.trainingquiz.com/MB-335-training-materials.html